Disrupt the Status Quo with a Holistic Hose Management Partner
The current market needs cooperation and support for EMEA and On Site Assistance, so much so that clients have expressed a market urgency in the hose planning sphere. Currently clients are approaching the market directly or via their agents for assistance. This creates a gap of knowledge transfer where clients have top-of-the-range products, but are unsure how to maintain and operate this optimally.
Market Need for Holistic Hose Planning
When it comes to hose planning, emergency support for immediate onsite engineering in case of failure is the first pain point that comes to mind, but when one approaches hose planning holistically, the market need becomes even more complex.
To avoid numerous emergency scenarios, there is a need for better hose logistics and storage, installation, testing and disposal tools and procedures. Procedures that favour hose life extension while maintaining the low level of risks and high level of performance.
For this reason, Marsol developed its Advanced Systems Integrity Management (ASIM) Program, an all-encompassing solution that ensures quality and efficiency fit for purpose.
Market Development Strategy & Brand Enhancement for Hose Planning
To approach this market need, short term and long term hose planning is required.
Short term services aim to increase volumes per customer.
How?
- Direct sales through Agents
- Provide enhancement services
- Tendering -Upsell Options
- Build relationships through long term call out services
Long term services aim to increase market share without necessity to increase individual clients’ volumes.
How?
- Retain existing clients
- Develop new clients
- Strengthen your brand locally and worldwide
- Through: Differentiators
- Localized rapid engineering response
- ASIM –Integrity management support leading to
- Hose life extension and life cycle management programs
Through short and long term hose planning, we enhance agents capability by supporting agents with value added tools.
This holistic hose planning approach changes focus from basic factory sales into enhanced turn key solution packages including:
•Site assessment (Operational)
•Site Specific Modeling
•Engineering
•Storage
•Installation
•Maintenance
By proactively working with a holistic hose planning service provider like Marsol, agents can offer their clients aftersales and integrity services endorsed by the factory : An approach that disrupts the status quo.
Choosing your Hose Planning Partner
Ensure that your hose planning partner’s people are trained at the factory to ensure OEM aligned solutions and warranty protection programs.
Our Main Drivers
- We reduce client’ costs whilst
- Enhancing the service by
- redirecting expenditure
In order to:
- Maintain the intrinsic value of the facility
- Avoid interruption
- Safe operating practices with reduced risk
- Protect the environment
- Establish possible points of failure and mitigations programs
- Ensuring term cost effective functionality of the facility and assets Contributing to
- Long Term Market Development Strategy & Client Support
Establishing your hose management service focus
Services should address potential points of failure in support of its long term techno-commercial integrity management programs. This includes
- Integrity management and life extension of the facility and its individual components (pipeline, SPM, PLEM, hoses)
- Life prediction of the asset based on design criteria, Cause & Effect studies, and actual site conditions
- Collection and Analysis of the data to achieve realistic prediction and comparison risks
- Spares optimisation, storage, preservation program, cost reduction, material recycling
- Establishing service centers, identifying common denominators thus achieving standardisation and commonality of design
- Achieving economies of scale and optimisation of holding/hidden costs
Such a holistic hose management partnership offers the unique opportunity to combine strengths of both the integrity management partner and the agent supplier’s product specific knowledge and field experience.
Packaging this approach means combining expertise to fulfill the client’s expectations without losing focus on respective core competencies.
Your hose management plan should also be designed to offer
- Optimal risk management
- Minimization of OPEX and downtime costs
- Increased reliability and achievement of max life
- Optimization of CAPEX and OPEX Expenditure while considering cause and effect.
Successful towage assistance of grounded vessel in Bahama’s
Kotug Seabulk Maritime’s tugs in Freeport, Grand Bahama were requested to urgently assist a container vessel that ran aground at the Freeport Anchorage.
At the time of the grounding, the vessel was under pilotage, and being towed dead-ship by four tugs from another company. The four tugs unsuccessfully attempted to re-float the vessel before calls were made out to KSM. RT Blackbeard, RT Raptor and SD Calypso were immediately dispatched to assist the tugs already on scene. Both Rotortugs® connected to the bow of the vessel, and the SD Calypso connected center lead aft. Three other tugs also pushed on the starboard quarter and another pulled via the center lead forward tow point.
It took around five minutes of pulling before the ship floated off the bottom and could be towed out into deeper waters. The Pilot then released the four tugs initially called out and requested the three KSM tugs take over the entire job. RT Raptor shifted to C/L forward, and RT Blackbeard remained alongside without a line connected. Finally, the vessel was brought safely into port later that night.
All maneuvers were completed safely and conducted with a high level of skill.
Chris Bhalai, Operations Manager of KSM: “Our team did a fantastic job! Something we train our people for, but you never know for sure how things work out until a real-life situation like this one occurs. I am truly proud of our crew! This was also a good opportunity to display the advantages of these highly sophisticated tugs. We’re happy we were able to assist and possibly prevented a greater catastrophe.”
Best Practices for your SPM Hose Management Plan
Are you putting together your SPM hose plan or revisiting your O&M strategy? Here we discuss examples of marine hose applications, lessons learned and best practices that help you to fulfil your fiduciary duties.
GREENFIELD OR BROWNFIELD SPM Hose plan
It’s never too early or too late to start your SPM Hose plan the right way.
When hoses begin to show symptoms or points of failure we apply the following process:
1. Find Root Cause
Before you hastily begin to treat symptoms such as ruptures, for example, ask yourself why they have occurred in the first place. This will help you identify numerous holistic factors that could be affecting your SPM hose plan.
2. Assumptions vs Facts / Data / History
Don’t let years of experience blind you. No two terminals are exactly the same.
Change is a constant and the sooner you realise this, the sooner you will begin to value data that can guide your SPM hose plan.
3. Analysis / Knowledge + Experience
Once you have obtained the required data, you can begin to cast an analytical eye.
This is where the application of knowledge and experience is pertinent. Derive correlation and explore all known and unknown paths.
4. Proactive Long Term Solutions
When you have successfully identified the root cause and you have taken into account all holistic factors, you can begin to create a more robust SPM hose plan with long term durability, efficiency and sustainability in mind.

Determining the root cause of issues in your SPM Hose Plan
When looking for symptoms of failure in your SPM hose plan, it is paramount that you determine the root cause through holistic analysis.
Here are some pinpoints to look for.
List of Hose Indicator examples
- Wrap-around
- Kinking
- Auto-submergence
- Change in buoyancy
- Contact
- Sheltering & Chafing
- Leak detector activation
- Catastrophic Failures
- Bearing
- Hose Handling
- Contact
- Float Loss
- String Length
- Environment
- Handling
- Exceeding hose life

SPM Hose Plan – Lessons Learned
In this section, we highlight two case studies, each with its own challenges and bespoke solution for the best performing SPM hose plan.
Case study 1: Changing Environment
In this project, our belief that change is constant was yet again proved by the ever-changing environment and its effects on terminal efficiency and longevity.
Project overview
- System Design
- Assumptions
- Regional data vs Site-specific data
- Landscape changes
- Coastline changes
- Operational consequences
What the hoses told us:
Upon inspection of the current hoses in use, we discovered that local conditions have changed from the basis of design. This was clear through the hose misbehaviour and symptoms, or points of failure.
Symptoms:
Rapid abnormal wear of floating hoses and tanker rail components.
Our listening method:
Collected and analysed data
What we heard:
Through SPM hose plan analysis and site experience we identified
- Root Cause
- Cost-Effective Solutions
- Optimum hose life

Case study 2: Design Assumptions
In this project, we investigated the effect that seabed assumptions in modelling can have on hoses, buoys and PLEM loading.
Project overview
- Seabed variations
- Winter and summer positions
- Near and Far Scenarios
- Understanding current direction & magnitude throughout the water column
- Effect on behaviour and integrity
What the hoses told us:
These hoses showed signs of impact that not only required a temporary fix to preserve the current hoses but also long term solutions that would prevent further damage.
Symptoms:
• Subsea hose string to hose string contact
• Subsea hose string to seabed contact
Our listening method:
Collected and analysed data
What we heard:
Through SPM hose plan analysis and site experience we identified
• Chain trenching, affecting chain pretension
• Increased buoy excursion
• Predominant winter & summer buoy position
• Change in hose profile

Fiduciary duties linked to your SPM hose plan
It is your fiduciary duty to make informed decisions regarding your SPM hose plan.
If you listen to your system you will get to know it. Once you know your system intimately any changes in performance or signs of upcoming symptoms will easily be noticed. This will help you adapt to change and maintain the intrinsic value of the facility.
It is your fiduciary duty to avoid interruption in your efficiency by predicting system behaviour. This, in turn, will help you to protect the environment and offer safe operating practices with reduced risk.
When your system is understood holistically you will begin to progress from O&M towards integrity, resulting in all the above-mentioned successes.
Conclusion
It is important to give SPM Hose plan management the tools to make informed decisions regarding hose and system O&M.
At Marsol we strive to share our holistic philosophies that have proven success time and time again.
- Listen to the hoses
- Find the root causes
- Implement optimum solution
These best practices within the SPM hose plan enable design modifications and operational changes that are fit for purpose.
Is your management team equipped with the best tools and processes for the job? Find out today.
Stop Pollution with Readiness for Intertidal and Shallow Water Emergency Pipeline Repair
Having an Emergency pipeline repair plan in place not only saves our oceans (and your reputation), but it also protects against unplanned expenses. At Marsol, we have identified a service to prepare and be ready for pipeline emergencies in shallow waters, tackling the challenges that intertidal zones present, such as shifting sands and tides.

Why is emergency pipeline repair important?
In a report in 1993, the Joint Group of Experts on the Scientific Aspects of Marine Environmental Protection (GESAMP) estimated total oceanic oil pollution at 2.3 million tonnes per year, 24% of which is leaked during transportation and shipping.
As the amount of oil being transported has roughly tripled, it stands to reason that the amount of oil pollution will have tripled as well. Statistics around this, however, are inconclusive, but the issue should not be around just how much oil enters the ocean – the question should be why it ever enters the ocean at all.
In piped transportation of hydrocarbons, pipelines inevitably travel along or through intertidal zones where they face harsher elements and mechanical damage. Such areas are not always easily accessible by typical marine service providers, and as such, extends the time lost and oil spilt before a fix is applied.
For this reason, Marsol International has launched a specialist Emergency Pipeline Repair Service (EPRS) to safeguard shallow-water intertidal zones.

How does Marsol make Emergency Pipeline Repair Service possible in intertidal areas?
In order to supply emergency pipeline repair, Marsol has worked to develop sophisticated support assets such as Modular HDPE Pontoons and HDPE craft – products that have been tried and tested in hostile and difficult environments.
EPRS has been developed over the last six years to service all types of environmental situations and geotechnical configurations, to address the inherent challenge of accessing delicate areas not normally serviced from sea or shore.
Marsol International has worked with various partners to develop multi-purpose tools and equipment which offer functionality and versatility, resulting from the company’s experience in developing specialist diver-operated equipment, capable of work in dry areas, the intertidal zone and subsea.
Mike Young, director of Marsol International, explains: “Marsol has a strong team of engineers who understand first-hand the real-life scenarios on a busy oil export hub. Should a pipeline require repair, time is of the essence. Safeguarding against environmental damage, minimising the impact on production and ultimately protecting company reputation is vital. EPRS offers an experienced team who can act fast.”
That said, we firmly believe that prevention is better than cure, so Marsol also offers a pre-emptive Pipeline Integrity Management service to ensure all bases are covered.
Why is Intertidal pipeline repair different to deepwater repair?
Due to various clients’ requests for a turnkey solution, EPRS has been launched to best service the needs of a niche market in the environmentally delicate intertidal zone. This requires a different but complementary skill set from subsea or deepwater pipeline repair.
Intertidal Pipeline Repair Challenges
- Shifting sands
- Powerful tides
- Safe access in shallow water

It will utilise the company’s experienced offshore terminal and marine workforce to locate and stabilise the ground to access damaged pipelines in the intertidal zone, and to implement the requisite pipeline repair. Repair scenarios such as pipeline rupture, pin-hole leak, dents and buckles, internal and external pipeline pitting and problems due to corrosion are considered pipeline emergencies.
EPRS will be driven by the nature of the pipeline failure or damage, the pipeline size and specification, as well as the site location, and offers a complete range of specialised equipment required to work in intertidal zones, including multi-purpose amphibious units, amphibious excavators, modular trench shoring systems and all-terrain/amphibious personnel carriers.
Find out more about our Emergency Pipeline Response Service today.
TTC signs MoU with Abu Dhabi Maritime Academy
Abu Dhabi, 18 December 2019
KOTUG signs MoU with Abu Dhabi Maritime Academy to develop strategic partnership
KOTUG Training & Consultancy and Abu Dhabi Maritime Academy (ADMA), signed a Memorandum of Understanding (MoU) to establish a long term strategic partnership. The MoU encompasses exclusive training of hundreds of tug masters and captains in the Middle East Region by certified trainers of KOTUG at ADMA’s state of the art facilities.
Facing the increasing demand for qualified maritime professionals, ADMA is seeking ways to safeguard its best-in-class training for which the organization is renowned. KOTUG fulfils this requirement being able to offer first-class trainers to tutor staff on the spot. As the only ISO 9001 certified Tug Training Company in the world, TTC sets exceedingly high standards for the training facilities it uses and ADMA perfectly meets these standards in its use of a fully equipped and exclusive Maritime Simulator Centre. Not only offering real-world insights into the challenges faced in the maritime industry, it also equips students with the right tools for mitigating risk and overcoming odds through an in-depth understanding of situations they may face.
Joint Pilot Tug Master training is requested more and more by various ports in the world to increase port safety and efficiency, therefore effective and efficient team work between Pilot and Tug Masters is one of the key training programmes of KOTUG that will now be conducted at ADMA.
Patrick Everts, General Manager of Tug Training & Consultancy said “We are extremely happy with this strategic partnership. The Middle East is one of the key growth markets and we only want to work with training facilities that match the quality we stand for. This encompasses combined classroom and simulator training on state-of-the-art simulators. ADMA meets these requirements with their modern facilities very well. We are looking forward to starting our training and providing the students with our highly regarded KOTUG Certificate, ensuring more safety and efficiency to the maritime industry.”
“We are very pleased that we can continue to offer the highest standards of training in our facilities and are confident that together we will provide a large number of well trained professionals to the Middle East maritime industry” added Hamad Al Maghrabi, Managing Director of ADMA.
Optimize your CapEx and OpEx with a Holistic Terminal O&M Philosophy
When it comes to offshore construction, investors and owners often miss one valuable piece of the puzzle – long term continuous operation and maintenance (O&M). O&M is not something to be considered an afterthought, but instead, an investment to be considered from the very beginning, with holistic application throughout the project lifecycle. In this way your terminal will not only function more efficiently, but also at a better OpEx, with smaller CapEx.
Offshore construction with O&M in mind
When it comes to designing and constructing an offshore terminal, it is of paramount importance to determine two aspects before proceeding. What are the requirements in terms of throughput? How is the terminal going to be operated? Once this has been established, the basis of design can be finalised incorporating al the operational needs and design requirements. Thus, giving a blend of design parameters that ensure optimisation of both CapEx and OpEx. Typically, this would be intrinsic to establishing the budget and the EPC Contractor would need to construct in line with the above parameters. Is it thus fair to ask: “Have the interests of all stakeholders been considered?”
When approaching offshore construction holistically, it stands to reason that those who will use and regulate the facility should be involved in the design and construction process to ensure capital costs and operating expenses are optimised, while the ongoing integrity of the system is maintained.
Decisions should not be governed simply by minimising the design and fabrication costs. Instead, start by creating an operating philosophy document for O&M that deals with the entire value chain and lifecycle of the project.
Discrepancies from FEED to O&M
Over the years it has become obvious throughout the development process, that there were inconsistent contractual priorities when converting the Front-end Engineering & Design (FEED) concepts into reality (conflict between project management being short-term and operational management being long-term having different priorities and consequences).
We have to keep in mind that the owners, or financiers, will not be the operators of the terminal. This means that by the time these facilities are completed, the contracting structure (from FEED through to project champion) will involve investors’ consultants, the EPC contractor, contractors’ consultants, subcontractors and vendors.
The ‘Missing Man’ here is the future operator, who will inevitably take full care and custody of the facility under the O&M contract.
The needs and vulnerabilities of this stakeholders are often not considered by the preceding contractors, as it’s not the scope of any individual participator, leading to discrepancies between what is functional, what is required and what is constructed. In such cases, a lot of time and money has gone to waste.
To ensure that this does not happen to you, we suggest reaching out for a holistic approach based on the principle of interface management.

This very important consideration should not be stitched on in the end, but instead, be integrated into the design, engineering, fabrication, installation and operation processes right from the start of the project design.
The focus here will be on operational costs, to save on construction while building a terminal perfectly suited and regulated to meet your site-specific needs.
Optimising OpEx with O&M
For any project there needs to be a minimum viable product (MVP) with focus on OpEx (operational cost) optimisation. This is in part achieved through the conversion of the O&M philosophy into a basis of design, thus ensuring that operability is considered and catered for in the end design.
OpEx optimisation is best achieved by influencing the facility’s design and engineering at the early stages of the project because changes made at this stage can be made with the lowest cost impact while, at the same time, maximizing the design effect on long term OpEx. This is MARSOL’s operational engineering approach.
There are numerous components involved in ensuring the integrity of the system throughout its operating life, including design life realization, life expectancy and possible life extension, which should all be considered as part of the base of design inputs.
As an operating company, MARSOL is not only focused on sound design principles in order to optimize OpEx, but also to ensure sound design and component inputs to offer an underwritten long-term integrity management service.
Long-term integrity O&M
If your terminal is long passed its FEED stage, you can still optimise. MARSOL has invested years of experience and knowledge of the field into the creation of Marsol’s Advanced Systems Integrity Management (ASIM). ASIM uses data collection, analysis, holistic field condition data and methodologies (both physical and operational) to arrive at the optimum design for the site and service. This is of paramount importance as quite often, the operating environment in the modern-day context is changing, and thus the design parameters are no longer relevant and modifications may be needed.
Although ideally applied through design and construction, ASIM is effective at any point in the project lifecycle, because it follows the Marsol continuous improvement cycle which is aligned with The Deming Cycle.
The Deming Cycle (also known as PDSA Cycle), is a logical sequence of four repetitive steps for continuous improvement and learning.

The only constant we know is change. As investors and management, it is paramount to fully understand the implications of the changes, and adjust accordingly, as part of the integrity management regime.
Over the last 50 years, Marsol International Personnel has developed engineering solutions for the fabrication, commissioning and operation of offshore terminals and infrastructures. During that period, we have increasingly identified and reengineered points of failure in many different systems. Some were generated by design and engineering, but many by the changing environmental conditions and by operational practices not suited to that particular facility.
Controlling your CapEx with O&M
Although operating expenditure is crucial to a project’s success, the up-front capital expenditure (CapEx) is equally important. It is true to say that a sound OpEx Minimum Viable Product is maximised by sound design and engineering at the CapEx stage. However, if CapEx is considered in isolation, OpEx can be negatively affected. Costing you more in the long run.
This being the case it is vital to focus on design and engineering optimisation that not only takes into account the end goal and client requirements, but also considers expediency and cost-effective fabrication, material and component selection, installation methodologies, the operating environment and personnel.
Within the CapEx there are separate cost drivers that should be identified and accommodated. Right from the outset, during the FEED process design, decisions should not be governed simply by minimising the design and fabrication costs.

Consideration should include the cost of installation and operation, including preventative, and corrective and preservation maintenance principles. Assigning the responsibility for design and installation to an EPC contractor may facilitate the first step, but not the second; generally, the design has been approved already (often a variation of a generic design) by the client before issuing the tender. This places you back in the realm of discrepancy between FEED and long-term O&M.
An example of the above is the pipeline design: a pipeline needs specialist equipment, which in itself will require significant mobilisation and operating costs; at this stage, the advantages that could be gained by acquiring a more robust and costly pipe (one that could eventually result in savings in installation costs and have potential for a longer lifespan) will have been forsaken.
It is the same principle as the OpEx optimisation model: First we need to take the O&M philosophy, and resultant basis of design inputs, and then create a design, engineering and installation regime that encompasses all the requirements. It must optimise fabrication and installation costs while at the same time supporting the long term integrity management service.
When all is said and done, a facility that has a reduced risk of failure and the potential for life extension allows the parties to offer and underwrite such a service. This approach then addresses not only the client’s requirements, but also the needs of the other stakeholders, with regards operability.
Decisions should not be governed simply by minimising the design and fabrication costs.
Starting with an MVP
Marsol has developed a holistic approach to CapEx optimisation that has been established with a focus on SPM integrity management. This means that by combining the two skills sets, the client can be offered a full turnkey solution from FEED to operations, supporting the owner, EPC contractor, OEMS and future operators responsible for O&M.
This approach allows the smooth transition from FEED to long-term operations and protects all parties’ interests, avoiding costly (and potentially reputation-damaging) contractual discussions and disputes and replaces the blame game with sound technical solutions.
It is important to remain cognisant of your impact on the environment throughout the entire process. This is not only limited to -for example- a loss of containment incident and the obvious subsequent spill, but also the knock-on effect to unrelated parties (fisherfolk as an example) who are stakeholders to the environment in which your facility operates. Important to note that your day to day operations (without any incidents) may also affect these stakeholders in a negative way.
ASIM was originally developed to address similar criteria at brownfield installations without the benefit of being involved at FEED or basis of design phase. The principle of ASIM is to enter an existing field with the intent of establishing a holistic picture of the field and its operations. Then through the assessment of design criteria, historic information, new data and using experience gained on multiple sites, at different geographic locations, over extended periods of time, arrive at a site-specific integrity protocol. By creating the history you are providing managers the tools to make informed decisions, thus fulfilling their fiduciary duty.

Conclusion
By adopting a rounded, full lifecycle approach it is possible to ensure that all stakeholders take an approach that optimises both cost and operational efficiency at the minimum acceptable risk level over the entire life of a facility. The result is a win-win situation for all concerned.
Starting a new project with your eyes on CapEx optimization? Don’t settle for mediocre: Talk to the experts.
Ready to optimize an existing project’s O&M? Let’s discuss.
KOTUG AND HORIZON MARITIME START KOTUG CANADA
KOTUG International B.V. (KOTUG) and Horizon Maritime Services Ltd (Horizon Maritime)announce that they have formed ‘KOTUG Canada’, a joint venture company which will offer terminal and harbour towage services across Canada.
KOTUG AND BOSKALIS SELL KOTUG SMIT TOWAGE TO BOLUDA
KOTUG International BV and Royal Boskalis Westminster N.V., 50/50 shareholders of Kotug Smit Towage, intend to sell their shares to Boluda Group (Boluda).
FIRST ASSISTANCE PRELUDE SHELL FLNG FACILITY
KOTUG performed it’s first official assistance to Prelude, Shell FLNG facility, the largest floating facility ever built.
KOTUG MARITIME SERVICES AUSTRALIA PTY LTD
KT Maritime Services Australia Pty Ltd, has changed its name into KOTUG MARITIME SERVICES AUSTRALIA PTY LTD